NWPT pilot one-pager (public) Site type: fenced yard (mine or quay) Air gap: 1.00 m First useful module: 25 kW (G2) — planned, not built 100 kW (studied): 4 × 25 kW; ICNIRP zone ~3.3 m (simulated) 1 MW (studied): ~240 kg copper; 1.12 MVA; zone ~6.3 m (simulated) TETHER on a pilot: target 3 / 6 / 11 kW; flush sliding concrete covers; Tx stays at floor level 5 kW research link: design complete in Ansys Maxwell 3D; 97.18 % coil-to-coil (simulated); not energised above 1 kW G0: L, M, R_ac not yet posted Nothing here is an offer or a delivery date. research@nwpt.pt · https://www.nwpt.pt/en/partners/