Roadmap

Gates G0 to G5, 5 kW to 1 MW.

Roadmap

Gates with honest status, for funders and partners. G2 is the decisive gate.

GatePowerWhat is newStatus
G05 kWCoil set measured, L/M/R_ac verifiedin progress
G15 kWConductor upgrade, Q ≥ 1200planned
G225 kWSingle module, kV-class tank, PD qualifiedplanned
G3100 kWFour modules, current sharingstudied
G4250 kWTen modules, MV grid connectionstudied
G51 MWFull sitestudied

25 kW across a metre at high efficiency would itself be a first at that gap. Beyond it the work is replication and integration rather than new physics.